The roof is almost on. This past weekend we met with the builder and electrician.
We hope to have the tubs/showers delivered on Thursday. I am attempting to get counter tops narrowed down and our final plumbing order (faucets, toilets, sinks...) should be made this week.
We have our cabinets all picked out, however we will be needing to make a couple minor changes I think before we order them.
We ordered our frig. last week...our local electrical company was offering an energy saving rebate, along with Home Depot (10% off) and then the actual manufacturer offered a rebate...so we save a couple bucks with all those rebates. (happy days)
We have our other appliances picked out, however we are waiting for sales or incentives, since we don't need them right now.
Bill is taking care of the floors, we currently have red oak in our kitchen and really like it. This time however we are going to go with white oak for the kitchen and stairs. We are attempting to save all of the current wood floors in the existing house and then we hope to put cork floors in the bedroom upstairs.
We never realized all of the decisions that had to be made...WOW!!
We are attempting to make the main floor handicapped accessible. So there are a couple of things that we had to change, but not too many.